- Distance (from the file)
- 53.8 km / 33.4 mi
- Elevation gain (from the file)
- 1,721 m / 5,646 ft
- Elevation loss (from the file)
- 1,720 m / 5,643 ft
- Climb per kilometer
- 32 m/km / 169 ft/mi
- Descent per kilometer
- 32 m/km / 169 ft/mi
- Steepest grade
- 45%
The biggest climbs
| Starts at | Length | Gain | Average grade |
|---|---|---|---|
| 36.4 km / 22.6 mi | 1.1 km / 0.7 mi | 216 m / 709 ft | 18.9% |
| 40.3 km / 25.1 mi | 1.9 km / 1.2 mi | 196 m / 643 ft | 10.5% |
| 3.6 km / 2.2 mi | 1.9 km / 1.2 mi | 167 m / 548 ft | 8.7% |
| 12.6 km / 7.8 mi | 0.9 km / 0.5 mi | 147 m / 482 ft | 17.2% |
| 45.4 km / 28.2 mi | 0.9 km / 0.5 mi | 117 m / 384 ft | 13.4% |
| 18.5 km / 11.5 mi | 1.1 km / 0.7 mi | 114 m / 374 ft | 10.3% |
The biggest descents
| Starts at | Length | Drop | Average grade |
|---|---|---|---|
| 47.6 km / 29.6 mi | 2.9 km / 1.8 mi | 275 m / 902 ft | 9.6% |
| 8.0 km / 5.0 mi | 1.5 km / 0.9 mi | 265 m / 869 ft | 17.4% |
| 37.6 km / 23.4 mi | 1.5 km / 0.9 mi | 223 m / 732 ft | 14.9% |
| 19.7 km / 12.2 mi | 1.9 km / 1.2 mi | 114 m / 374 ft | 6.1% |
| 15.5 km / 9.6 mi | 1.7 km / 1.0 mi | 105 m / 344 ft | 6.2% |
| 44.2 km / 27.5 mi | 1.0 km / 0.6 mi | 103 m / 338 ft | 9.9% |
Points on the course
- Start at 0.0 km / 0.0 mi
- Tiger Temple at 9.5 km / 5.9 mi, +348 m −334 m so far
- Spritzer EcoPark at 17.1 km / 10.6 mi, +639 m −640 m so far
- KTM Tunnel at 22.8 km / 14.2 mi, +766 m −762 m so far
- Changkat Ibol at 35.2 km / 21.9 mi, +965 m −956 m so far
- U-turn Kuning Sari at 39.3 km / 24.4 mi, +1,192 m −1,185 m so far
- Peak 300 at 41.7 km / 25.9 mi, +1,351 m −1,191 m so far
- Finish at 53.8 km / 33.4 mi, +1,721 m −1,720 m so far
Derived from the course file (myultra50-utmb-2027.gpx) analyzed Nov 7, 2026, not official race statistics. Official elevation gain 1,977 m / 6,486 ft, loss 1,744 m / 5,722 ft.
Download the course GPX The organizer's course file, for your watch or mapping app.